THROTTLE BODY REMOVAL

PROCEDURE


  1. REMOVE V-BANK COVER SUB-ASSEMBLY

    Click here

  2. REMOVE AIR CLEANER INLET COVER SUB-ASSEMBLY

    Click here

  3. REMOVE NO. 1 AIR CLEANER INLET

    Click here

  4. REMOVE FRONT WHEEL OPENING EXTENSION PAD LH

    Click here

  5. REMOVE FRONT WHEEL OPENING EXTENSION PAD RH

    Click here

  6. REMOVE NO. 1 ENGINE UNDER COVER

    Click here

  7. DRAIN ENGINE COOLANT

    Click here

  8. REMOVE INTAKE AIR CONNECTOR PIPE

    A000XFX

    1. Disconnect the No. 1 ventilation hose and No. 2 ventilation hose from the intake air connector pipe.

    2. Using a clip remover, detach the 2 wire harness clamps.

    3. Loosen the 3 hose clamps, and remove the intake air connector pipe.

  9. REMOVE THROTTLE BODY ASSEMBLY

    A000XR0

    1. Disconnect the throttle body motor connector.

    2. Remove the 4 bolts and throttle body assembly.

    3. A000VJ0E03
      *1 No. 4 Water Hose
      *2 No. 5 Water Hose

      Disconnect the No. 4 and No. 5 water by-pass hoses from the throttle body assembly.

    4. Remove the gasket from the intake manifold.