HEATER WATER PUMP INSTALLATION

PROCEDURE


  1. INSTALL HEATER WATER PUMP ASSEMBLY


    1. A000T8C

      Install the water pump with the 2 nuts.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    2. Connect the connector.

    3. Connect the 2 water hoses and install the 2 clips.

    4. A000ZEK

      Connect the 2 connectors to the oil pump driver ECU.

  2. INSTALL RADIATOR RESERVOIR ASSEMBLY

    Click here

  3. ADD ENGINE COOLANT

    Click here

  4. CHECK FOR ENGINE COOLANT LEAKS

    Click here

  5. INSTALL NO. 1 AIR CLEANER INLET

    Click here

  6. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY

    Click here

  7. INSTALL ENGINE ROOM SIDE COVER RH

    Click here

  8. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here

  9. INSTALL NO. 1 ENGINE UNDER COVER

    Click here