ENGINE HOOD MOULDING REASSEMBLY

CAUTION / NOTICE / HINT

Tech Tips

When installing the front hood moulding pad, heat the front hood moulding surface using a heat light.

Standard
Item Temperature
Hood Moulding 20 to 30°C (68 to 86°F)

Note

Do not heat the front hood moulding excessively.

PROCEDURE


  1. INSTALL FRONT HOOD MOULDING PAD


    1. Clean the front hood moulding assembly surface.


      1. Using a heat light, heat the front hood moulding assembly surface.

      2. Remove the double-sided tape from the front hood moulding assembly surface.

      3. Wipe off any tape adhesive residue with cleaner.

    2. Install a new front hood moulding pad.


      1. Remove the peeling paper from the face of a new front hood moulding pad.

        Tech Tips

        After removing the peeling paper, keep the exposed adhesive free from foreign matter.

      2. Install the front hood moulding pad.