FRONT CONSOLE BOX(w/ Refrigerated Cool Box) INSTALLATION

PROCEDURE


  1. INSTALL COOLING BOX ASSEMBLY


    1. Connect the connector and install the cooling box assembly.

    2. Sufficiently apply compressor oil to 2 new O-rings.

      Refrigerant Compressor Oil
      HFC-134a (R134a) ND-OIL 8 or equivalent
      HFO-1234yf (R1234yf) ND-OIL 12 or equivalent
    3. Install the 2 O-rings to the 2 cooler pipes.

    4. Connect the 2 cooler pipes with the 2 bolts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    5. Connect the drain cooler hose.

    6. Install the 7 bolts and 2 screws.

    7. Install the clip.

  2. INSTALL CENTER FLOOR CARPET COVER RH


    1. Attach the 3 claws to install the center floor carpet cover RH.

  3. INSTALL REAR CONSOLE END PANEL SUB-ASSEMBLY


    1. Connect the connector and install the rear console end panel sub-assembly.

  4. INSTALL COOLING BOX TRAY


    1. Install the cooling box tray.

  5. INSTALL NO. 1 CONSOLE BOX DUCT (for Single Air Conditioning System)

    Click here

  6. INSTALL CONSOLE PANEL SUB-ASSEMBLY


    1. for Automatic Transmission:

      Click here

    2. for Manual Transmission:

      Click here

  7. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY


    1. for Automatic Transmission:

      Click here

    2. for Manual Transmission:

      Click here

  8. INSTALL FRONT NO. 2 CONSOLE BOX INSERT

    Click here

  9. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  10. INSTALL CONSOLE BOX INSERT

    Click here

  11. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  12. INSTALL LOWER CONSOLE PANEL SUB-ASSEMBLY (for Manual Transmission)

    Click here

  13. INSTALL LOWER CONSOLE PANEL SUB-ASSEMBLY (for Automatic Transmission, w/o Module Switch)

    Click here

  14. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (for Automatic Transmission, w/ Module Switch)

    Click here

  15. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION

    Click here

  16. INSTALL INSTRUMENT PANEL FINISH PANEL END LH

    Click here

  17. INSTALL NO. 1 INSTRUMENT PANEL FINISH PANEL CUSHION

    Click here

  18. INSTALL INSTRUMENT PANEL FINISH PANEL END RH

    Click here

  19. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY

    Click here

  20. INSTALL FRONT SEAT ASSEMBLY


    1. for Manual Seat:

      Click here

    2. for Power Seat:

      Click here

    3. for Walk in Seat Type:

      Click here

  21. CHARGE REFRIGERANT


    1. for HFC-134a(R134a):

      Click here

    2. for HFO-1234yf(R1234yf):

      Click here

  22. WARM UP ENGINE


    1. for HFC-134a(R134a):

      Click here

    2. for HFO-1234yf(R1234yf):

      Click here

  23. CHECK FOR REFRIGERANT GAS LEAK


    1. for HFC-134a(R134a):

      Click here

    2. for HFO-1234yf(R1234yf):

      Click here