COMPRESSOR(for 1GR-FE) INSTALLATION

PROCEDURE


  1. ADJUST COMPRESSOR OIL


    1. When replacing the cooler compressor with a new one, gradually discharge the refrigerant gas from the service valve, and drain the following amount of oil from the new cooler compressor before installation.

      Standard
      for Single Air Conditioning System:
      (The amount of oil inside a new cooler compressor: 120 to 135 cc (4.1 to 4.6 fl. oz.)) - (The amount of oil remaining in the removed cooler compressor) = (The amount of oil to be removed when replacing the compressor)
      Standard
      for Dual Air Conditioning System:
      (The amount of oil inside a new cooler compressor: 180 to 195 cc (6.1 to 6.6 fl. oz.)) - (The amount of oil remaining in the removed cooler compressor) = (The amount of oil to be removed when replacing the compressor)

      Note


      • When checking the compressor oil level, follow the A/C system precautions.

      • If a new cooler compressor is installed without removing some oil remaining in the pipes of the vehicle, the oil amount will be too large. This prevents heat exchange in the refrigerant cycle and causes refrigerant failure.

      • If the volume of oil remaining in the removed cooler compressor is too small, check for oil leakage.

      • Be sure to use ND-OIL 8 or equivalent for compressor oil.

  2. INSTALL COOLER COMPRESSOR ASSEMBLY

    B001GCYE04

    1. Install the stud bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Temporarily install the cooler compressor assembly with the 3 bolts and nut.

    3. Tighten the 3 bolts and nut in the sequence shown in the illustration.

      Torque:
      for bolt
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }
      for nut
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }
    4. Connect the connector.

  3. CONNECT SUCTION HOSE SUB-ASSEMBLY


    1. Remove the attached vinyl tape from the hose.

    2. Sufficiently apply compressor oil to a new O-ring and the fitting surface of the cooler compressor.

      Compressor oil
      ND-OIL 8 or equivalent
    3. Install the O-ring to the suction hose.

    4. B001E58E06
      Text in Illustration
      *A except Model Code GRJ150L-GKFEKV, GRJ150L-GKAEKV
      *B Model Code GRJ150L-GKFEKV, GRJ150L-GKAEKV

      Connect the suction hose to the cooler compressor with the 2 bolts.

      Torque:
      for bolt C
      7.8 N*m  { 80 kgf*cm, 69 in.*lbf }
      for bolt D
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
  4. CONNECT DISCHARGE HOSE SUB-ASSEMBLY


    1. Remove the attached vinyl tape from the hose.

    2. Sufficiently apply compressor oil to a new O-ring and the fitting surface of the cooler compressor.

      Compressor oil
      ND-OIL 8 or equivalent
    3. Install the O-ring to the discharge hose.

    4. Connect the discharge hose to the cooler compressor with the bolt.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
  5. INSTALL GENERATOR ASSEMBLY


    1. Install the generator assembly Click here.

  6. CHARGE REFRIGERANT

    Click here

  7. WARM UP ENGINE

    Click here

  8. CHECK FOR REFRIGERANT GAS LEAK

    Click here

  9. INSTALL UPPER RADIATOR SUPPORT SEAL

    Click here