REAR NO. 1 SEAT INNER BELT ASSEMBLY(for 60/40 Split Double-folding Seat Type RH Side) INSTALLATION

PROCEDURE


  1. INSTALL REAR NO. 1 SEAT INNER BELT ASSEMBLY RH


    1. Install the inner belt with the 2 bolts.

      Torque:
      42 N*m  { 428 kgf*cm, 31 ft.*lbf }
  2. CONNECT NO. 1 SEAT 3 POINT TYPE BELT ASSEMBLY RH


    1. A01XDD4E04
      Text in Illustration
      *a Protruding Part

      Connect the 3 point type belt floor anchor with the bolt.

      Torque:
      42 N*m  { 428 kgf*cm, 31 ft.*lbf }

      Note

      The anchor part of the seat belt must not overlap the protruding part.

    2. Return the seat cushion to its original position.