PROCEDURE
INSPECT NO. 1 INTEGRATION RELAY (for 5L-E)
| *a | Component with harness connected (No. 1 Integration Relay) |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the No. 1 integration relay.