GENERATOR INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR


    1. B001EDYE02

      Install the generator with the 2 bolts.

      Torque:
      for bolt A
      62 N*m  { 632 kgf*cm, 46 ft.*lbf }
      for bolt B
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. Install the generator wire with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    3. Install the terminal cap.

    4. Connect the generator connector.

  2. INSTALL NO. 1 AIR HOSE

    Click here

  3. INSTALL AIR CLEANER CASE ASSEMBLY

    Click here

  4. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

    Click here

  6. INSTALL FRONT FENDER APRON SEAL RH

    Click here

  7. INSTALL FAN AND GENERATOR V BELT


    1. Install the fan and generator V belt Click here.

  8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.