PROCEDURE
INSTALL GENERATOR ASSEMBLY
Install the generator bracket to the generator with the bolt.
Install the generator with the 2 bolts.
Install the generator bracket with the bolt.
Connect the wire harness clamp.
Install the wire harness with the 2 bolts.
Connect the generator connector to the generator.
Connect the generator wire with the nut.
Close the terminal cap.
INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
INSTALL WIRING HARNESS CLAMP BRACKET
Install the wiring harness clamp bracket with the bolt.
Attach the clamp.
INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
for Integrated Type:
Install the No. 2 idler pulley with the bolt.
for Separate Type:
Install the No. 2 idler pulley cover plate, No. 2 idler pulley and idler pulley cover plate with the bolt.
INSTALL FAN AND GENERATOR V BELT
INSTALL V-BANK COVER
INSTALL BATTERY TRAY
INSTALL BATTERY
INSTALL BATTERY HOLD DOWN CLAMP
Install the battery hold down clamp with the 2 nuts.
CONNECT CABLE TO POSITIVE BATTERY TERMINAL
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.