VANE PUMP(for 2TR-FE) INSTALLATION

PROCEDURE


  1. INSTALL VANE PUMP ASSEMBLY (w/ VSC)


    1. Install the vane pump with the 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  2. INSTALL VANE PUMP ASSEMBLY (w/o VSC)


    1. Install the vane pump with the 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. Connect the connector to the oil pressure switch.

  3. CONNECT PRESSURE FEED TUBE ASSEMBLY (w/ VSC)


    1. Install a new gasket and the pressure feed tube to the vane pump with the union bolt.

      Torque:
      50 N*m  { 510 kgf*cm, 37 ft.*lbf }

      Tech Tips

      Make sure the stopper of the pressure feed tube touches the vane pump.

    2. Connect the 2 connectors.

  4. CONNECT PRESSURE FEED TUBE ASSEMBLY (w/o VSC)


    1. Install a new gasket and the pressure feed tube to the vane pump with the union bolt.

      Torque:
      50 N*m  { 510 kgf*cm, 37 ft.*lbf }

      Tech Tips

      Make sure the stopper of the pressure feed tube touches the vane pump.

  5. CONNECT RETURN HOSE


    1. Connect the hose with the clip.

  6. INSTALL FAN AND GENERATOR V BELT

    Click here

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  8. ADD POWER STEERING FLUID

  9. BLEED AIR FROM POWER STEERING SYSTEM

    Click here

  10. INSPECT FOR POWER STEERING FLUID LEAK