VANE PUMP(for 1GR-FE) INSTALLATION

PROCEDURE


  1. INSTALL VANE PUMP ASSEMBLY


    1. Install the vane pump with the 2 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
    2. Install the wire harness bracket with the bolt.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
  2. CONNECT PRESSURE FEED TUBE


    1. Install a new gasket to the pressure feed tube.

    2. Connect the pressure feed tube and install the union bolt.

      Torque:
      50 N*m  { 510 kgf*cm, 37 ft.*lbf }

      Tech Tips

      Make sure the stopper of the pressure feed tube touches the vane pump.

  3. CONNECT NO. 1 OIL RESERVOIR TO PUMP HOSE


    1. Connect the No. 1 oil reservoir to pump hose to the vane pump assembly with the clip.

  4. CONNECT POWER STEERING OIL PRESSURE SWITCH CONNECTOR


    1. Connect the 2 connectors.

  5. INSTALL FAN AND GENERATOR V BELT

    Click here

  6. INSTALL AIR CLEANER CASE

  7. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

  8. INSTALL AIR CLEANER CAP AND HOSE

    Click here

  9. INSTALL V-BANK COVER

    Click here

  10. INSTALL FRONT FENDER APRON SEAL RH

    Click here

  11. INSTALL FRONT WHEEL RH

    Torque:
    for steel wheel
    112 N*m  { 1137 kgf*cm, 82 ft.*lbf }
    for aluminum wheel
    103 N*m  { 1050 kgf*cm, 76 ft.*lbf }
  12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  13. ADD POWER STEERING FLUID

  14. BLEED POWER STEERING FLUID

    Click here

  15. INSPECT FOR POWER STEERING FLUID LEAK