DOOR CONTROL BATTERY(for LHD) INSTALLATION

PROCEDURE


  1. INSTALL DOOR CONTROL BATTERY


    1. Attach the hook.

    2. Install the door control battery with the nut.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  2. INSTALL DRIVER SIDE JUNCTION BLOCK ASSEMBLY

    Click here