CAUTION / NOTICE / HINT
Tech Tips
Perform "Inspection After Repairs" after replacing the camshaft, No. 2 camshaft or cylinder head sub-assembly Click here.
PROCEDURE
INSTALL CYLINDER HEAD GASKET
Clean and degrease the contact surfaces of the cylinder head sub-assembly and cylinder block sub-assembly.
| *1 | Cylinder Head Gasket |
| *a | 7.0 to 9.0 mm (0.276 to 0.354 in.) |
| *b | 5.0 to 7.0 mm (0.197 to 0.276 in.) |
| *c | 3.0 to 5.0 mm (0.118 to 0.197 in.) |
| *d | 166.25 mm (6.55 in.) |
| *e | 62.25 mm (2.46 in.) |
| *f | Side View |
| *g | View A |
Apply seal packing to a new cylinder head gasket as shown in the illustration.
| Seal Packing |
|---|
| Toyota Genuine Seal Packing Black, Three Bond 1207 B or equivalent. |
Note
Be sure to clean and degrease the contact surfaces.
Apply seal packing to the bead on the cylinder head gasket.
Install the cylinder head gasket within 3 minutes and tighten the cylinder head set bolts within 15 minutes after applying seal packing.
| *a | Lot No. |
|
Engine Front |
Place the cylinder head gasket on the cylinder block surface with the lot No. stamp facing upward.
Note
Remove any oil from the contact surface.
Make sure that the cylinder head gasket is installed in the correct direction.
INSTALL CYLINDER HEAD SUB-ASSEMBLY
Tech Tips
Perform "Inspection After Repairs" after replacing the cylinder head sub-assembly Click here.
The cylinder head bolts are tightened in 3 successive steps.
Place the cylinder head sub-assembly on the cylinder block.
Note
Make sure that no oil is on the mounting surface of the cylinder head sub-assembly.
Place the cylinder head sub-assembly on the cylinder block gently so as not to damage the gasket with the bottom part of the cylinder head sub-assembly.
Install the plate washers to the cylinder head set bolts.
Apply a light coat of engine oil to the threads and under the heads of the cylinder head set bolts.
Step 1:
Using several steps, install and uniformly tighten the 10 cylinder head set bolts with plate washers in the sequence shown in the illustration.
Mark the front of each cylinder head set bolt head with paint.
Step 2:
Tighten the cylinder head set bolts 90° in the sequence shown in step 1.
Step 3:
Tighten the cylinder head set bolts another 90° in the sequence shown in step 1.
Check that the paint marks are now at a 180° angle to the front.
w/ Oil Cooler:
Connect the No. 4 water by-pass pipe with the bolt.
CONNECT ENGINE WIRE
Connect the engine wire to the cylinder head sub-assembly with the 3 bolts.
INSTALL VALVE STEM CAP
Apply a light coat of engine oil to the valve stem ends.
Install the 16 valve stem caps to the cylinder head sub-assembly.
Note
Do not drop the valve stem caps into the cylinder head sub-assembly.
INSTALL VALVE LASH ADJUSTER ASSEMBLY
Inspect each valve lash adjuster assembly before installing it Click here.
Install the 16 valve lash adjuster assemblies to the cylinder head sub-assembly.
Note
Install each valve lash adjuster assembly to the same place it was removed from.
INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY
Apply clean engine oil to the valve lash adjuster assembly tips and valve stem cap surfaces.
| *1 | No. 1 Valve Rocker Arm Sub-assembly |
| *2 | Valve Lash Adjuster Assembly |
| *3 | Valve Stem Cap |
| *a | INCORRECT |
| *b | CORRECT |
Install the 16 No. 1 valve rocker arm sub-assemblies as shown in the illustration.
Note
Install the valve stem cap, valve lash adjuster assembly and No. 1 valve rocker arm sub-assembly to the same places they were removed from.
INSTALL CAMSHAFTS
Tech Tips
Perform "Inspection After Repairs" after replacing the camshaft or No. 2 camshaft Click here.
Apply clean engine oil to the camshaft cams and cylinder head journals.
Position the camshaft and No. 2 camshaft as shown in the illustration.
| *1 | No. 1 Valve Rocker Arm Sub-assembly |
| *2 | Valve Lash Adjuster Assembly |
| *3 | Valve Stem Cap |
| *a | INCORRECT |
| *b | CORRECT |
Make sure that the No. 1 valve rocker arm sub-assemblies are installed as shown in the illustration.
INSTALL CAMSHAFT BEARING CAP
Temporarily install the No. 1 camshaft bearing cap.
Confirm the location for each No. 2 camshaft bearing cap and install each one to the proper location.
Uniformly temporarily install the 20 bolts while keeping the camshaft level.
Tighten the 20 bolts in the order shown in the illustration.
INSTALL NO. 1 CHAIN VIBRATION DAMPER
INSTALL CHAIN SUB-ASSEMBLY
INSTALL CHAIN TENSIONER SLIPPER
INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY
CHECK NO. 1 CYLINDER TO TDC/COMPRESSION
INSTALL TIMING CHAIN GUIDE
INSTALL CYLINDER HEAD COVER CONNECTOR SUB-ASSEMBLY
INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
INSTALL VENTILATION PIPE
Install the ventilation pipe with the bolt.
Connect the No. 3 water by-pass hose to the cylinder head sub-assembly, and slide the clip to secure the hose.
Connect the No. 3 ventilation hose to the ventilation pipe, and slide the clip to secure the hose.
Connect the No. 1 ventilation hose to the PCV valve sub-assembly, and slide the clip to secure the hose.
Connect the No. 1 water by-pass hose to throttle body with motor assembly, and slide the clip to secure the hose.
INSTALL HEATER HOSE
INSTALL EXHAUST MANIFOLD
INSTALL AIR SWITCHING VALVE ASSEMBLY
INSTALL NO. 4 INTAKE PIPE
INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
INSTALL ENGINE ASSEMBLY