ENGINE UNIT INSTALLATION

CAUTION / NOTICE / HINT

Note


  • When replacing the parts in the following chart (A), replace the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly with new ones.

    Replaced Parts (A) Pipes Requiring New Replacement
    Injector assembly (including shuffling the injector assemblies between the cylinders)
    • No. 1 injection pipe sub-assembly

    • No. 2 injection pipe sub-assembly

    Supply pump assembly Fuel inlet pipe sub-assembly

    • Common rail assembly

    • Cylinder block sub-assembly

    • Cylinder head sub-assembly

    • Cylinder head gasket

    • Timing chain case assembly


    • No. 1 injection pipe sub-assembly

    • No. 2 injection pipe sub-assembly

    • Fuel inlet pipe sub-assembly

  • After removing the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly, clean them with a brush and compressed air.

  • The injector assembly is a precision instrument. Do not use the injector assembly if it is struck or dropped.

  • The supply pump assembly is a precision instrument. Do not use the supply pump assembly if it is struck or dropped.

  • The common rail assembly is a precision instrument. Do not use the common rail assembly if it is struck or dropped.

  • Hold the supply pump assembly itself during removal and installation. Do not hold the pre-stroke control valve or fuel pipe, etc.

  • Hold the common rail assembly itself during removal and installation. Do not hold the pressure discharge valve or fuel pressure sensor, etc.

  • Make sure foreign matter does not enter the fuel path.

PROCEDURE


  1. INSTALL NO. 1 WATER HOSE CLAMP BRACKET


    1. Install the No. 1 water hose clamp bracket to the timing chain case assembly with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  2. INSTALL CRANKSHAFT PULLEY

    Click here

  3. INSTALL CRANKSHAFT PULLEY COVER

    Click here

  4. INSTALL VISCOUS HEATER CRANKSHAFT PULLEY (w/ Viscous Heater)

    Click here

  5. INSTALL CAMSHAFT OIL SEAL RETAINER

    Note

    If the camshaft oil seal retainer is dropped, replace it with a new one.


    1. Before installing a new camshaft oil seal retainer, clean the installation surface of the No. 3 camshaft bearing cap and cylinder head sub-assembly and remove any foreign matter.

    2. B001GQNE01
      Text in Illustration
      *1 Camshaft Oil Seal Retainer
      *a Depth

      Using SST and a hammer, tap in a new camshaft oil seal retainer to the No. 3 camshaft bearing cap and cylinder head sub-assembly as shown in the illustration.

      SST
      09223-46011
      Standard depth
      0 to 0.8 mm (0 to 0.0315 in.)
  6. INSTALL NO. 4 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY


    1. Install the No. 4 vacuum transmitting pipe sub-assembly to the cylinder block sub-assembly with the bolt.

      Torque:
      23 N*m  { 235 kgf*cm, 17 ft.*lbf }
  7. INSTALL NO. 3 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY


    1. Install the No. 3 vacuum transmitting pipe sub-assembly to the cylinder head sub-assembly and cylinder block sub-assembly with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the No. 4 vacuum transmitting hose sub-assembly to the No. 3 vacuum transmitting pipe sub-assembly.

  8. INSTALL NO. 2 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY


    1. Install the No. 2 vacuum transmitting pipe sub-assembly to the cylinder block sub-assembly and oil pan sub-assembly with the 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  9. INSTALL NO. 1 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY


    1. Install the No. 1 vacuum transmitting pipe sub-assembly to the cylinder head sub-assembly and cylinder block sub-assembly with the 3 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the No. 2 vacuum transmitting hose sub-assembly to the No. 3 vacuum transmitting pipe sub-assembly.

  10. INSTALL VACUUM SWITCHING VALVE SUB-ASSEMBLY (for Engine Mounting)

    Click here

  11. INSTALL VACUUM PUMP ASSEMBLY


    1. B001EEB

      Coat 2 new O-rings with engine oil, and install them to the vacuum pump assembly.

    2. B001FSUE02

      Install the vacuum pump assembly so that the coupling teeth of the vacuum pump assembly labeled A and the groove of the No. 2 camshaft labeled B can engage.

    3. Install the vacuum pump assembly to the cylinder head sub-assembly with the 3 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    4. Connect the No. 1 vacuum transmitting hose sub-assembly to the vacuum pump assembly.

  12. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

    Click here

  13. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY

    Click here

  14. INSTALL THERMOSTAT

    Click here

  15. INSTALL WATER INLET

    Click here

  16. INSTALL WATER OUTLET SUB-ASSEMBLY


    1. Install a new gasket and the water outlet sub-assembly to the timing chain cover sub-assembly with the 4 bolts and 2 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  17. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY


    1. Install the No. 2 water by-pass pipe sub-assembly to the engine water pump assembly and water inlet with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the No. 3 water by-pass hose to the water outlet sub-assembly, and slide the clamp to secure the hose.

  18. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY

    Click here

  19. TEMPORARILY INSTALL TURBO OIL INLET PIPE SUB-ASSEMBLY

    Click here

  20. TEMPORARILY INSTALL EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY


    1. Install 2 new gaskets to the exhaust manifold and turbocharger sub-assembly.

    2. Temporarily install the exhaust manifold to turbocharger sub-assembly with 3 new nuts.

    3. B001IKRE01
      Text in Illustration
      *1 Collar
      B001DEF Engine Side

      Temporarily install the exhaust manifold with turbocharger sub-assembly, 8 collars and the 8 plate washers to the cylinder head sub-assembly with 8 new nuts.

      Note

      Make sure that the side of the collar with the smaller diameter faces the exhaust manifold.

    4. Install a new gasket on the union bolt side to turbo oil inlet pipe sub-assembly.

    5. Temporarily install the union bolt.

  21. INSTALL TURBO OIL OUTLET PIPE

    Click here

  22. TEMPORARILY INSTALL TURBOCHARGER STAY


    1. Temporarily install the turbocharger stay to the turbocharger sub-assembly, with 3 bolts and nut.

  23. TIGHTEN EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY

    Click here

  24. TIGHTEN TURBOCHARGER STAY

    Click here

  25. INSTALL NO. 1 VISCOUS HEATER BRACKET SUB-ASSEMBLY


    1. B001FF8E02

      Temporarily install the No. 1 viscous heater bracket sub-assembly to the cylinder block sub-assembly and timing chain cover sub-assembly with the 4 bolts.

    2. Tighten the 4 bolts in the sequence shown in the illustration to install the No. 1 viscous heater bracket sub-assembly.

      Torque:
      25 N*m  { 250 kgf*cm, 18 ft.*lbf }
  26. CONNECT NO. 1 AND NO. 2 TURBO WATER HOSE

    Click here

  27. INSTALL NO. 1 WATER BY-PASS PIPE


    1. Install a new gasket and the No. 1 water by-pass pipe to the timing chain cover sub-assembly with the 3 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Tech Tips

      Make sure that the claw of the gasket faces the No. 1 water by-pass pipe.

  28. INSTALL NO. 3 WATER BY-PASS PIPE

    Click here

  29. INSTALL FRONT ENGINE MOUNTING INSULATOR RH


    1. Install the front engine mounting insulator RH to the front No. 1 engine mounting bracket RH with the nut.

      Torque:
      64 N*m  { 653 kgf*cm, 47 ft.*lbf }
    2. Connect the No. 3 vacuum transmitting hose sub-assembly to the front No. 1 engine mounting bracket RH.

  30. INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY

    Click here

  31. INSTALL NO. 2 EXHAUST PIPE SUPPORT STAY

    Click here

  32. INSTALL NO. 1 TURBO INSULATOR

    Click here

  33. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

    Click here

  34. INSTALL AIR FUEL RATIO SENSOR

    Click here

  35. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR

    Click here

  36. INSTALL NO. 1 INJECTOR HOLDER

    Click here

  37. CONNECT NO. 4 WATER BY-PASS HOSE


    1. Connect the No. 4 water by-pass hose to the No. 1 injector holder, and slide the clamp to secure the hose.

  38. INSTALL NO. 5 WATER BY-PASS HOSE


    1. Attach the clamp and install the No. 5 water by-pass hose to the No. 1 water hose clamp bracket.

    2. Connect the No. 5 water by-pass hose to the No. 1 injector holder and water outlet sub-assembly, and slide the 2 clamps to secure the hose.

  39. INSTALL PCV PIPE (for Cold Area Specification Vehicles)

    Click here

  40. INSTALL PCV HOSE (except Cold Area Specification Vehicles)

    Click here

  41. INSTALL ENGINE COOLANT TEMPERATURE SENSOR

    Click here

  42. INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET

    Note

    Install the No. 1 compressor mounting bracket exactly as described in the procedures below to properly secure and prevent damage to the fan and generator V belt.


    1. B001EJL

      Temporarily install the No. 1 compressor mounting bracket to the cylinder block sub-assembly with the 2 bolts.

      Tech Tips

      Temporarily install the No. 1 compressor mounting bracket with the 2 bolts so that the No. 1 compressor mounting bracket can be moved by hand.

    2. B001EBGE02
      Text in Illustration
      *a No Clearance
      *b Push
      *c Front

      Push the No. 1 compressor mounting bracket toward the cylinder block sub-assembly as shown in the illustration and tighten bolt A.

      Torque:
      39 N*m  { 398 kgf*cm, 29 ft.*lbf }

      Tech Tips

      Make sure there is no clearance between the cylinder block sub-assembly and No. 1 compressor mounting bracket as shown in the illustration.

    3. B001HIGE01

      Uniformly tighten the 3 bolts in the order shown in the illustration.

      Torque:
      39 N*m  { 398 kgf*cm, 29 ft.*lbf }
  43. INSTALL NO. 5 WATER BY-PASS PIPE SUB-ASSEMBLY


    1. Install a new gasket and the No. 5 water by-pass pipe sub-assembly to the cylinder block sub-assembly with the 3 bolts.

      Torque:
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }

      Tech Tips

      Make sure that the claw of the gasket faces the No. 5 water by-pass pipe sub-assembly.

  44. INSTALL FUEL FILTER ASSEMBLY


    1. Install the fuel filter assembly to the cylinder block sub-assembly with the 2 nuts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  45. INSTALL NO. 3 FUEL PIPE

    Click here

  46. INSTALL HOSE BRACKET


    1. Install the hose bracket to the cylinder head sub-assembly with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  47. INSTALL GLOW PLUG ASSEMBLY

    Click here

  48. INSTALL NO. 1 GLOW PLUG CONNECTOR

    Click here

  49. INSTALL COMMON RAIL ASSEMBLY

    Click here

  50. TEMPORARILY INSTALL NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY

    Click here

  51. TIGHTEN INJECTOR ASSEMBLY

    Click here

  52. TIGHTEN NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY

    Click here

  53. INSTALL WIRING HARNESS CLAMP BRACKET


    1. B001FMVE02

      for LHD:

      Install the 3 wiring harness clamp brackets to the cylinder head cover sub-assembly with the 3 bolts.

      Torque:
      for bolt A
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      for bolt B
      8.4 N*m  { 86 kgf*cm, 74 in.*lbf }
    2. B001F0RE03

      for RHD:

      Install the 2 wiring harness clamp brackets to the cylinder head cover sub-assembly with the 2 bolts.

      Torque:
      for bolt A
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      for bolt B
      8.4 N*m  { 86 kgf*cm, 74 in.*lbf }
  54. INSTALL NOZZLE LEAKAGE PIPE ASSEMBLY

    Click here

  55. INSTALL NO. 1 FUEL PIPE

    Click here

  56. INSTALL WIRING HARNESS CLAMP BRACKET

    Click here

  57. INSTALL INTAKE MANIFOLD

    Click here

  58. INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY

    Click here

  59. INSTALL FUEL INLET PIPE SUB-ASSEMBLY

    Click here

  60. INSTALL NO. 1 FUEL HOSE

    Click here

  61. INSTALL NO. 2 FUEL HOSE

    Click here

  62. INSTALL NO. 4 FUEL PIPE SUB-ASSEMBLY

    Click here

  63. INSTALL FUEL PUMP MOTOR WIRE

    Click here

  64. INSTALL FUEL INJECTION PUMP COVER SUB-ASSEMBLY

    Click here

  65. REMOVE MANIFOLD STAY

    Click here

  66. INSTALL WIRING HARNESS CLAMP BRACKET

    Click here

  67. INSTALL NO. 2 FUEL PIPE


    1. Install the No. 2 fuel pipe to the manifold stay with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the No. 1 fuel hose to the No. 2 fuel pipe, and slide the clamp to secure the hose.

  68. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

    Click here

  69. INSTALL NO. 1 EGR COOLER AND NO. 2 EGR VALVE ASSEMBLY WITH ELECTRIC EGR CONTROL VALVE ASSEMBLY

    Click here

  70. INSTALL NO. 4 WATER BY-PASS PIPE SUB-ASSEMBLY


    1. Install the No. 4 water by-pass pipe sub-assembly to the intake manifold with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. for Cold Area Specification Vehicles:

      Attach the clamp and connect the No. 11 water by-pass hose to the No. 2 fuel pipe.

    3. Connect the water hose to the No. 2 EGR valve assembly, and slide the clamp to secure the hose.

    4. Connect the No. 6 water by-pass hose to the No. 4 water by-pass pipe sub-assembly, and slide the clamp to secure the hose.

  71. INSTALL VACUUM CONTROL VALVE SET

    Click here

  72. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY


    1. Using an E8 "TORX" socket wrench, install 2 new stud bolts to the exhaust manifold.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Install 2 new gaskets and the No. 1 EGR pipe sub-assembly to the exhaust manifold, electric EGR control valve assembly and No. 1 vacuum transmitting pipe sub-assembly with the bolt and 4 new nuts.

      Torque:
      for bolt
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      for nut
      29 N*m  { 296 kgf*cm, 21 ft.*lbf }
  73. INSTALL CONNECTING WIRE


    1. Attach the 2 clamps and install the connecting wire to the hose bracket.

    2. Connect the connector to the common rail assembly.

  74. INSTALL NO. 3 WATER BY-PASS PIPE SUB-ASSEMBLY

    Click here

  75. INSTALL NO. 2 EGR PIPE

    Click here

  76. INSTALL EGR VALVE BRACKET

    Click here

  77. INSTALL DIESEL TURBO PRESSURE SENSOR

    Click here

  78. INSTALL GAS FILTER

    Click here

  79. INSTALL ENGINE COVER BRACKET


    1. Install the engine cover bracket to the cylinder head cover sub-assembly and hose bracket with the 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  80. INSTALL PIPE CLAMP

    Click here

  81. TEMPORARILY INSTALL NO. 2 VACUUM PIPE

    Click here

  82. TEMPORARILY INSTALL NO. 1 VACUUM PIPE

    Click here

  83. TIGHTEN NO. 2 VACUUM PIPE

    Click here

  84. TIGHTEN NO. 1 VACUUM PIPE

    Click here

  85. INSTALL EXHAUST GAS TEMPERATURE SENSOR

    Click here

  86. INSTALL DIFFERENTIAL PRESSURE SENSOR

    Click here

  87. INSTALL NO. 2 WATER BY-PASS PIPE

    Click here

  88. INSTALL DIESEL THROTTLE BODY ASSEMBLY

    Click here

  89. INSTALL AIR TUBE ASSEMBLY

    Click here

  90. INSTALL ENGINE WIRE

  91. INSTALL NO. 2 ENGINE COVER BRACKET

    Click here

  92. INSTALL NO. 3 ENGINE COVER BRACKET

    Click here