PROCEDURE
INSPECT NO. 1 INTEGRATION RELAY
| *a | Component without harness connected (No. 1 Integration Relay) |
- | - |
Note
The EDU relay, IG2 relay, EFI MAIN NO. 1 relay and EFI MAIN NO. 2 relay are built into the No. 1 integration relay.
Before performing the relay inspections for the relays of the No. 1 integration relay, inspect the EDU, IG2, EFI MAIN NO. 1 and EFI MAIN NO. 2 fuses.
Inspect the EDU relay.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the No. 1 integration relay.
Inspect the IG2 relay.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the No. 1 integration relay.
Inspect the EFI MAIN NO. 1 relay.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the No. 1 integration relay.
Inspect the EFI MAIN NO. 2 relay.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the No. 1 integration relay.
INSPECT DCU RELAY (DCU)
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the DCU relay.
INSPECT NOx PM RELAY (NOx PM)
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the NOx PM relay.