VACUUM SWITCHING VALVE(for Engine Mounting) INSTALLATION

PROCEDURE


  1. INSTALL VACUUM SWITCHING VALVE SUB-ASSEMBLY


    1. Install the 2 vacuum hoses to the vacuum switching valve sub-assembly.

    2. Install the vacuum switching valve sub-assembly with the bolt and nut.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Connect the 3 vacuum hoses to the vacuum switching valve sub-assembly.

    4. Connect the connector and 2 clamps to the vacuum switching valve sub-assembly.

  2. CONNECT STARTER ASSEMBLY

    Click here

  3. INSTALL FRONT NO. 1 FENDER APRON TO FRAME SEAL LH


    1. Install the front No. 1 fender apron to frame seal LH with the 6 clips.