ECM INSTALLATION

PROCEDURE


  1. INSTALL NO. 2 ECM BRACKET


    1. Install the No. 2 ECM bracket with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  2. INSTALL ECM BRACKET


    1. Install the bracket with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  3. INSTALL ECM


    1. Install the ECM with the bolt and nut.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Connect the 6 connectors.

  4. INSTALL GLOVE COMPARTMENT DOOR SUB-ASSEMBLY


    1. Install the glove compartment door Click here.

  5. PERFORM INITIALIZATION

    Click here