STARTER(for 2.7 kW Type) INSTALLATION

PROCEDURE


  1. INSTALL STARTER ASSEMBLY


    1. Install the starter assembly with the bolt and nut.

      Torque:
      68 N*m  { 693 kgf*cm, 50 ft.*lbf }
    2. Connect the starter wire with the nut.

      Torque:
      21 N*m  { 215 kgf*cm, 16 ft.*lbf }
    3. Connect the starter connector.

    4. Install the terminal cap.

  2. CONNECT CLUTCH RELEASE CYLINDER ASSEMBLY (for Manual Transmission)

    Click here

  3. INSTALL REAR ENGINE UNDER COVER ASSEMBLY

    Click here

  4. INSTALL FRONT NO. 1 FENDER APRON TO FRAME SEAL LH


    1. Install the frame seal with the 5 clips.

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.