PROCEDURE
INSTALL THERMOSTAT
Install a new gasket to the thermostat.
Install the thermostat with the jiggle valve upward.
Tech Tips
The jiggle valve may be set within 10° to either side of the prescribed position.
INSTALL WATER INLET
Install a new gasket and the water inlet to the timing chain cover sub-assembly with the bolt and 2 nuts.
CONNECT NO. 2 RADIATOR HOSE
Connect the No. 2 radiator hose to the water inlet, and slide the hose clamp to secure the hose.
CONNECT VANE PUMP ASSEMBLY
INSTALL FAN AND GENERATOR V BELT
ADD ENGINE COOLANT
INSPECT FOR COOLANT LEAK
INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
INSTALL FRONT BUMPER COVER LOWER
INSTALL UPPER RADIATOR SUPPORT SEAL