PROCEDURE
INSTALL OIL COOLER ASSEMBLY
Install 2 new gaskets to the oil cooler.
Install the oil cooler to the oil cooler cover with the 4 nuts.
INSTALL OIL COOLER COVER SUB-ASSEMBLY
Install a new gasket and the oil cooler cover with the 13 bolts.
Connect the No. 2 vacuum transmitting pipe with the 2 nuts.
Connect the vinyl tube.
Connect the oil pressure switch connector.
INSTALL OIL FILTER SUB-ASSEMBLY
CONNECT NO. 3 WATER BY-PASS HOSE (w/ EGR Cooler)
Connect the No. 3 water by-pass hose.
INSTALL VACUUM CONTROL VALVE SET
INSTALL SUPPLY PUMP ASSEMBLY
Install the supply pump Click here.
INSTALL COMMON RAIL ASSEMBLY
Install the common rail Click here.
INSTALL STARTER ASSEMBLY
for 2.2 kW Type:
Install the starter Click here.
for 2.7 kW Type:
Install the starter Click here.
for 3.0 kW Type:
Install the starter Click here.
ADD ENGINE OIL
BLEED AIR FROM FUEL SYSTEM
ADD ENGINE COOLANT
INSPECT FOR COOLANT LEAK
INSPECT FOR FUEL LEAK
INSPECT FOR OIL LEAK
INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
INSTALL FRONT BUMPER LOWER COVER