PROCEDURE
REMOVE UPPER RADIATOR SUPPORT SEAL
REMOVE V-BANK COVER
REMOVE AIR CLEANER CAP AND HOSE
REMOVE AIR CLEANER CASE SUB-ASSEMBLY
REMOVE FRONT FENDER APRON SEAL LH
w/ KDSS:
Remove the 7 clips and fender apron seal.
w/o KDSS:
Remove the 5 clips and fender apron seal.
REMOVE FRONT FENDER APRON SEAL RH
Remove the 4 clips and fender apron seal.
REMOVE FRONT NO. 1 FENDER APRON TO FRAME SEAL LH
Remove the 5 clips and frame seal.
REMOVE FRONT NO. 1 FENDER APRON TO FRAME SEAL RH
Remove the 5 clips and fender apron seal.
REMOVE FRONT EXHAUST PIPE ASSEMBLY
Remove the front exhaust pipe Click here.
REMOVE MANIFOLD STAY
Remove the 3 bolts and manifold stay.
REMOVE AIR TUBE (w/ Secondary Air Injection System)
DISCONNECT NO. 2 STEERING INTERMEDIATE SHAFT SUB-ASSEMBLY (for RHD)
for Manual Tilt and Manual Telescopic Steering Column:
Disconnect the No. 2 steering intermediate shaft Click here.
for Power Tilt and Power Telescopic Steering Column:
Disconnect the No. 2 steering intermediate shaft Click here.
REMOVE NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
Remove the 3 bolts and heat insulator.
REMOVE EXHAUST MANIFOLD SUB-ASSEMBLY RH
w/ Secondary Air Injection System:
Disconnect the air fuel ratio sensor connector.
Remove the 6 nuts, manifold and gasket.
w/o Secondary Air Injection System:
Disconnect the air fuel ratio sensor connector.
Remove the 6 nuts, manifold and gasket.
REMOVE AIR FUEL RATIO SENSOR (for Bank 1 Sensor 1)
REMOVE NO. 2 MANIFOLD STAY
Remove the 3 bolts and No. 2 manifold stay.
REMOVE NO. 2 AIR TUBE (w/ Secondary Air Injection System)
REMOVE NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
Remove the 3 bolts and heat insulator.
REMOVE EXHAUST MANIFOLD SUB-ASSEMBLY LH
w/ Secondary Air Injection System:
Disconnect the air fuel ratio sensor connector.
Remove the 6 nuts, manifold and gasket.
w/o Secondary Air Injection System:
Disconnect the air fuel ratio sensor connector.
Remove the 6 nuts, manifold and gasket.
REMOVE AIR FUEL RATIO SENSOR (for Bank 2 Sensor 1)