ROOF DRIP SIDE FINISH MOULDING INSTALLATION

Tech Tips


  • Use the same procedure for the RH side and LH side.

  • The following procedure is for the LH side.


  1. INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP

    Note

    When installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.


    1. A01I5DLE02
      Text in Illustration
      *a Adhesive
      *b 2 to 3 mm Bead of Adhesive

      Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new No. 1 roof drip side finish moulding clips.

      Tech Tips

      Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F))

    2. Install the No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 No. 1 roof drip side finish moulding clips after lightly applying adhesive.

      A01I4PPE01
      Text in Illustration
      *A for Front *B for Rear
      *1 Protruding Part - -
      Standard Measurement
      Area Measurement Area Measurement
      A 4.0 mm (0.157 in.) B 4.0 mm (0.157 in.)
      C 1.8 mm (0.0709 in.) D 1.8 mm (0.0709 in.)
      E 4.0 mm (0.157 in.) F 4.0 mm (0.157 in.)
      G 1.8 mm (0.0709 in.) H 1.8 mm (0.0709 in.)
    3. Install the center roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 No. 1 roof drip side finish moulding clips.

      Tech Tips


      • Initial hardening time: 20 minutes

      • Complete hardening time: 48 hours

  2. INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING


    1. A01I5CV

      Engage the 2 No. 1 roof drip side finish moulding clips and install the center roof drip side finish moulding.