HYBRID CONTROL SYSTEM, Diagnostic DTC:P0ADB-227

DTC Code DTC Name
P0ADB-227 Hybrid Battery Positive Contactor Control Circuit Low

DESCRIPTION

Refer to the description for DTC P0AE6-225 Click here.

DTC No. INF Code DTC Detection Condition Trouble Area
P0ADB 227

Short to ground in the SMRB circuit:

Primary circuit of SMR (+) is malfunctioning.

(2 trip detection logic)


  • Wire harness or connector

  • Hybrid battery junction block assembly

  • Power management control ECU

Related Data List
DTC No. Data List
P0ADB-227
  • VL-Voltage before Boosting

  • VH-Voltage after Boosting

  • Power Resource VB

  • SMRP Status

  • SMRB Status

  • SMRG Status

  • SMRP Control Status

  • SMRB Control Status

  • SMRG Control Status

  • Conv Shutdown

  • MG2 Inverter Shutdown

  • MG1 Inverter Shutdown

WIRING DIAGRAM

Refer to the wiring diagram for the HV battery high-voltage line circuit Click here.

INSPECTION PROCEDURE

CAUTION:


  • Before inspecting the high-voltage system or disconnecting the low voltage connector of the inverter with converter assembly, take safety precautions such as wearing insulated gloves and removing the service plug grip to prevent electrical shocks. After removing the service plug grip, put it in your pocket to prevent other technicians from accidentally reconnecting it while you are working on the high-voltage system.

  • After removing the service plug grip, wait for at least 10 minutes before touching any of the high-voltage connectors or terminals. After waiting for 10 minutes, check the voltage at the terminals in the inspection point in the inverter with converter assembly. The voltage should be 0 V before beginning work Click here.

    Tech Tips

    Waiting for at least 10 minutes is required to discharge the high-voltage capacitor inside the inverter with converter assembly.

Note

After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notices before proceeding with work Click here.

Tech Tips


  • If P0ADB-227 is stored, the vehicle cannot be started.

  • After the repair, clear the DTCs, perform the following procedure and check that the same DTC (including pending DTC) is not output.


    1. Turn the power switch off and wait for 30 seconds or more.

    2. Turn the power switch on (READY) and wait for 30 seconds or more.

    3. Turn the power switch off and wait for 60 seconds or more.

PROCEDURE


  1. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - BODY GROUND)


    1. Disconnect the I3 power management control ECU connector.

    2. A01I36PE59
      Text in Illustration
      *a

      Rear view of wire harness connector

      (to Power Management Control ECU)

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Switch Condition Specified Condition
      I3-4 (SMRB) - Body ground Power switch off 25.0 to 59.0 Ω
    3. Reconnect the I3 power management control ECU connector.


    NG
    OK
  2. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - HYBRID BATTERY JUNCTION BLOCK ASSEMBLY)

    CAUTION:

    Be sure to wear insulated gloves.


    1. Check that the service plug grip is not installed.

      Note

      After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.

    2. Remove the No. 4 hybrid battery shield panel Click here.

    3. Disconnect the O9 hybrid battery junction block assembly connector.

    4. Disconnect the I3 power management control ECU connector.

    5. A01I2N0E01
      Text in Illustration
      *a

      Rear view of wire harness connector

      (to Power Management Control ECU)

      *b

      Rear view of wire harness connector

      (to Hybrid Battery Junction Block Assembly)

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Switch Condition Specified Condition
      I3-4 (SMRB) and O9-1 (SMRB) - Body ground and other terminals Power switch off 10 kΩ or higher
    6. Reconnect the I3 power management control ECU connector.

    7. Reconnect the O9 hybrid battery junction block assembly connector.

    8. Install the No. 4 hybrid battery shield panel.


    NG
    OK