НАСОС СИСТЕМЫ ОХЛАЖДЕНИЯ УСТАНОВКА

PROCEDURE


  1. INSTALL WATER PUMP ASSEMBLY


    1. B001X92E07

      Install a new gasket and the water pump with the 8 bolts shown in the illustration.

      Torque:
      for bolt A
      47 N*m  { 479 kgf*cm, 35 ft.*lbf }
      for bolt B
      23 N*m  { 235 kgf*cm, 17 ft.*lbf }
      for bolt C
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
      Standard Bolt
      Item Length Thread Diameter
      Bolt A 80 mm (3.15 in.) 10 mm (0.394 in.)
      Bolt B 70 mm (2.76 in.) 8 mm (0.315 in.)
      Bolt C 25 mm (0.984 in.) 8 mm (0.315 in.)
  2. INSTALL WATER PUMP PULLEY


    1. Temporarily install the pulley with the 4 bolts.

    2. B001ZV2E02

      Using SST, hold the pulley and tighten the 4 bolts.

      SST
      09960-10010   ( 09962-01000, 09963-01000 )
      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  3. INSTALL WATER INLET HOUSING


    1. Install a new gasket to the water pump.

    2. B001XHIE07
      Text in Illustration
      *1 No. 3 Water By-pass Hose
      *a RH Side
      *b Front

      Install the water inlet housing with the 3 bolts and connect the No. 3 water by-pass hose.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }

      Tech Tips

      Install the hose so that the direction of the hose clamp is as indicated in the illustration.

    3. B001W6DE01
      Text in Illustration
      *a RH Side
      *b Front

      Connect the No. 5 water by-pass hose.

      Tech Tips

      Install the hose so that the direction of the hose clamp is as indicated in the illustration.

  4. CONNECT NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY

    B002063E01

    1. Connect the water by-pass pipe with water hose.

      Text in Illustration
      *a Upper
      *b Front

      Tech Tips

      Install the hose so that the direction of the hose clamp is as indicated in the illustration.

    2. Install the 3 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Connect the No. 6 water by-pass hose.

  5. INSTALL NO. 1 WATER BY-PASS HOSE

    Click here

  6. INSTALL FAN SHROUD

    Click here

  7. INSTALL NO. 1 RADIATOR HOSE

  8. INSTALL NO. 2 RADIATOR HOSE

  9. INSTALL AIR CLEANER ASSEMBLY

    Click here

  10. INSTALL AIR CLEANER HOSE ASSEMBLY

    Click here

  11. ADD ENGINE COOLANT

    Click here

  12. INSPECT FOR COOLANT LEAK

    Click here

  13. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here

  14. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

    Click here

  15. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

    Click here

  16. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

    Click here