КЛАПАН ПРОДУВКИ АДСОРБЕРА УСТАНОВКА

PROCEDURE


  1. INSTALL PURGE VSV


    1. B001W0XE02
      Text in Illustration
      *a Upper

      Install the purge VSV with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. Connect the purge VSV connector.

  2. CONNECT PURGE LINE HOSE


    1. Connect the 2 purge line hoses.

      Tech Tips

      Turn the claw of the clip to the upper side.

  3. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here