ROOF DRIP SIDE FINISH MOULDING INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips


  • Use the same procedures for the RH side and LH side.

  • The procedures listed below are for the LH side.

  • When installing the clip, heat the vehicle body and clip using a heat light.

    Standard Heating Temperature
    Item Temperature
    Vehicle Body 40 to 60°C (104 to 140°F)
    Clip 20 to 30°C (68 to 86°F)

Note

Do not heat the vehicle body and clip excessively.

PROCEDURE


  1. INSTALL NO. 2 ROOF DRIP SIDE FINISH MOULDING RETAINER (w/ Roof Carrier)

    A01X7B8

    1. Install the retainer with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  2. INSTALL ROOF RACK BRACKET

    A01X0VA

    1. w/o Roof Carrier:

      Install the 4 brackets with the 8 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. w/ Roof Carrier:

      Install the bracket with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  3. INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP

    Tech Tips

    Perform the following procedures when replacing the No. 1 roof drip side finish moulding clip.

    Note

    Remove the double-sided tape where the clips will be installed on the body and clean the body with a non-residue type solvent.


    1. B001ZZOE01
      *1 2 to 3 mm Bead of Adhesive
      *2 Adhesive

      Apply a 2 to 3 mm (0.0788 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to a new No. 1 roof drip side finish moulding clip.

      Tech Tips

      Adhesive strength (tensile strength): 13.7 MPa (140 kgf/cm2, 1991 psi) or more when the temperature is 23°C (73°F).

    2. Apply primer to the body where the No. 1 roof drip side finish moulding clip will be installed.

      Note

      Do not let the primer dry.

    3. A01WYZ1E03
      *1 Location

      While using the position shown in the illustration as a reference, place the No. 1 roof drip side finish moulding clip onto the roof panel. Then position and install the clip after lightly pressing against it so that the adhesive adheres to the primer.

    4. Install the rear roof drip side finish moulding when 40 minutes or more have elapsed after pressing and installing the No. 1 roof drip side finish moulding clip.

      Tech Tips


      • Initial hardening time: 40 minutes

      • Complete hardening time: 48 hours

  4. INSTALL REAR ROOF DRIP SIDE FINISH MOULDING LH

    A01XAAT

    1. Attach the clip to install the moulding.

  5. INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING LH

    A01X1L2

    Tech Tips

    Use the same procedure to install the moulding on the other side.


    1. Install the moulding as shown in the illustration.

  6. INSTALL ROOF DRIP SIDE FINISH MOULDING LH

    A01X0UU

    Tech Tips

    Use the same procedure to install the moulding on the other side.


    1. Install the moulding as shown in the illustration.

  7. INSTALL ROOF DRIP SIDE FINISH MOULDING JOINT COVER LH

    A01X355

    1. w/o Roof Carrier:

      Attach the claws and clips to install the 4 covers.

    2. w/ Roof Carrier:

      Attach the claw and clip to install the cover.

  8. INSTALL ROOF RACK ASSEMBLY (w/ Roof Rack)


    1. Install the roof rack assembly Click here.

  9. INSTALL ROOF CARRIER ASSEMBLY LH (w/ Roof Carrier)


    1. Install the roof carrier assembly LH Click here.