COMBINATION METER(w/ Multi-information Display) INSTALLATION

PROCEDURE


  1. INSTALL COMBINATION METER ASSEMBLY


    1. A01X8NM

      Connect the connectors.

    2. A01X75O

      Install the combination meter with the 4 screws.

  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY


    1. A01X448

      Connect the connector.

    2. A01X74N

      Attach the 9 claws to install the finish panel.

    3. A01WZZ1

      Attach the 4 claws.

  3. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH


    1. A01X5NH

      Attach the 2 claws to install the panel garnish.

  4. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH


    1. A01X3HJ

      Connect the connectors and 2 clamps.

    2. Attach the 8 claws to install the panel pad.

    3. Install the screw.

    4. Install the clip.

  5. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION


    1. A01XAVQ

      Attach the 7 claws to install the panel cushion.

  6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH


    1. A01WZYJ

      Attach the 3 claws to install the panel garnish.

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note


    • Reset the Autoaway/Return function setting to the previous condition by changing the customize parameter Click here.

    • When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.