DESCRIPTION
This circuit provides power to operate the certification ECU (smart key ECU assembly).
WIRING DIAGRAM
PROCEDURE
INSPECT FUSE (IMB)
Remove the IMB fuse from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPLACE FUSE |
| OK |
|
CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU [SMART KEY ECU ASSEMBLY] - BATTERY AND BODY GROUND)
| *1 | Front view of wire harness connector: (to Certification ECU [Smart Key ECU Assembly]) |
Disconnect the E29 ECU connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| OK |
|
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE Click here |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |