DOOR CONTROL RECEIVER INSTALLATION

PROCEDURE


  1. INSTALL DOOR CONTROL RECEIVER


    1. A01XBNZ

      Install the receiver with the bolt.

      Torque:
      15 N*m  { 153 kgf*cm, 11 ft.*lbf }
    2. Connect the connector.

  2. INSTALL REAR UPPER PILLAR GARNISH RH

    Click here

  3. INSTALL FRONT QUARTER TRIM PANEL ASSEMBLY RH

    Click here

  4. INSTALL REAR SEAT COVER CAP (w/ Rear No. 2 Seat, except Face to Face Seat Type)

    Click here

  5. INSTALL NO. 1 TONNEAU COVER HOLDER CAP (w/ Tonneau Cover)

    Click here

  6. INSTALL REAR FLOOR MAT REAR SUPPORT PLATE

    Click here

  7. INSTALL REAR DOOR SCUFF PLATE RH

    Click here

  8. INSTALL REAR STEP COVER

    Click here

  9. INSTALL REAR NO. 2 SEAT ASSEMBLY RH (for Face to Face Seat Type)


    1. Install the rear No. 2 seat assembly RH Click here.

  10. INSTALL REAR NO. 2 SEAT ASSEMBLY RH (except Face to Face Seat Type)


    1. Install the rear No. 2 seat assembly RH Click here.