RELAY INSTALLATION

PROCEDURE


  1. INSTALL WINCH MAIN RELAY


    1. Install the relay with the 3 nuts.

      Torque:
      9.3 N*m  { 95 kgf*cm, 83 in.*lbf }
    2. Connect the 2 wires with the 2 nuts.

      Torque:
      9.4 N*m  { 96 kgf*cm, 84 in.*lbf }
    3. Connect the connector.

      B001XMT
  2. INSTALL UPPER RADIATOR SUPPORT SEAL

    Click here

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.