NETWORK GATEWAY ECU(for LHD) INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips

A bolt without a torque specification is shown in the standard bolt chart Click here.

PROCEDURE


  1. INSTALL NETWORK GATEWAY ECU


    1. Install the network gateway ECU with the bolt.

  2. INSTALL COWL SIDE JUNCTION BLOCK RH


    1. Connect the back side of the 2 connectors and attach the wire harness clamp.

    2. Install the cowl side junction block RH with the 2 nuts and screw.

      Torque:
      for Nut
      7.6 N*m  { 77 kgf*cm, 67 in.*lbf }
    3. Connect the 5 connectors.

  3. INSTALL WINDSHIELD WIPER RELAY ASSEMBLY

    Click here

  4. INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL

    Click here

  5. INSTALL INSTRUMENT PANEL BOX DOOR KNOB

    Click here

  6. INSTALL NO. 3 INSTRUMENT CLUSTER FINISH PANEL GARNISH

    Click here

  7. INSTALL FRONT PASSENGER SIDE KNEE AIRBAG ASSEMBLY

    Click here

  8. INSTALL COWL SIDE TRIM BOARD RH

    Click here

  9. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  10. INSTALL FRONT DOOR SCUFF PLATE RH

    Click here

  11. INSTALL INSTRUMENT SIDE PANEL RH

    Click here

  12. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH

    Click here

  13. INSTALL NO. 1 INSTRUMENT PANEL FINISH CUSHION

    Click here

  14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  15. CHECK SRS WARNING LIGHT

    Click here