4WD CONTROL ECU INSTALLATION

PROCEDURE


  1. INSTALL FOUR WHEEL DRIVE CONTROL ECU


    1. A01X603

      Install the ECU with the bolt.

      Torque:
      13 N*m  { 127 kgf*cm, 9 ft.*lbf }
    2. Connect the 2 ECU connectors.

  2. INSTALL STEERING CONTROL ECU (for RHD)

    Click here

  3. INSTALL STEERING CONTROL WITH JUNCTION BLOCK (for RHD)

    Click here

  4. INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL (for LHD)

    Click here

  5. INSTALL INSTRUMENT PANEL BOX DOOR KNOB (for LHD)

    Click here

  6. INSTALL NO. 3 INSTRUMENT CLUSTER FINISH PANEL GARNISH (for LHD)

    Click here

  7. INSTALL COWL SIDE TRIM BOARD RH

    Click here

  8. INSTALL DRIVER SIDE KNEE AIRBAG ASSEMBLY (for RHD)

    Click here

  9. INSTALL NO. 1 SWITCH HOLE BASE (for RHD)

    Click here

  10. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL (for RHD)

    Click here

  11. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for RHD)

    w/ Floor Under Cover: Click here

  12. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH (for RHD)

    Click here

  13. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH (for RHD)

    Click here

  14. INSTALL FRONT PASSENGER SIDE KNEE AIRBAG ASSEMBLY (for LHD)

    Click here

  15. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for LHD)

    w/ Floor Under Cover: Click here

  16. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH

    Click here

  17. INSTALL NO. 1 INSTRUMENT PANEL FINISH PANEL CUSHION

    Click here

  18. INSTALL FRONT DOOR SCUFF PLATE RH

    Click here

  19. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  20. CHECK SRS WARNING LIGHT

    Click here