DESCRIPTION
The TCM memory contains the programs for the normal and power shift patterns.
By following the programs corresponding to the signals from the PWR switch (integration control and panel assembly), the park/neutral position switch and other various sensors, the TCM switches the shift solenoid valves on and off, and controls the transmission gear change operation.
WIRING DIAGRAM
PROCEDURE
INSPECT PWR SWITCH (INTEGRATION CONTROL AND PANEL ASSEMBLY)
| *a | Component without harness connected (Integration Control and Panel Assembly) |
Remove the integration control and panel assembly Click here.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPLACE INTEGRATION CONTROL AND PANEL ASSEMBLY Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (INTEGRATION CONTROL AND PANEL ASSEMBLY - BODY GROUND)
| *a | Front view of wire harness connector (to Integration Control and Panel Assembly) |
Disconnect the integration control and panel assembly connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (INTEGRATION CONTROL AND PANEL ASSEMBLY - ECM)
| *a | Front view of wire harness connector (to ECM) |
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |