VALVE BODY ASSEMBLY INSPECTION

PROCEDURE


  1. INSPECT SHIFT SOLENOID VALVE SL1

    A01X4SME01
    *a Component without harness connected: (Shift Solenoid Valve SL1)

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      • Battery positive (+) with a 21 W bulb → Shift solenoid valve Terminal 1

      • Battery negative (-) → Terminal 2

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  2. INSPECT SHIFT SOLENOID VALVE S1

    A01XBXEE01
    *1 Shift Solenoid Valve S1:

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve S1 connector terminal - Shift solenoid valve S1 body 20°C (68°F) 11 to 15 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      • Battery positive (+) → Shift solenoid valve S1 connector

      • Battery negative (-) → Shift solenoid valve S1 body

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  3. INSPECT SHIFT SOLENOID VALVE S2

    A01X8DVE01
    *1 Shift Solenoid Valve S2:

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve S2 connector terminal - Shift solenoid valve S2 body 20°C (68°F) 11 to 15 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      • Battery positive (+) → Shift solenoid valve S2 connector

      • Battery negative (-) → Shift solenoid valve S2 body

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  4. INSPECT SHIFT SOLENOID VALVE S3

    A01XBXEE02
    *1 Shift Solenoid Valve S3:

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve S3 connector terminal - Shift solenoid valve S3 body 20°C (68°F) 11 to 15 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      • Battery positive (+) → Shift solenoid valve S3 connector

      • Battery negative (-) → Shift solenoid valve S3 body

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  5. INSPECT SHIFT SOLENOID VALVE S4

    A01WZP7E03
    *1 Shift Solenoid Valve S4:

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve S4 connector terminal - Shift solenoid valve S4 body 20°C (68°F) 11 to 15 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      • Battery positive (+) → Shift solenoid valve S4 connector

      • Battery negative (-) → Shift solenoid valve S4 body

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  6. INSPECT SHIFT SOLENOID VALVE SL2

    A01X4SME02
    *a Component without harness connected: (Shift Solenoid Valve SL2)

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      • Battery positive (+) with a 21 W bulb → Shift solenoid valve Terminal 1

      • Battery negative (-) → Terminal 2

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  7. INSPECT SHIFT SOLENOID VALVE SR

    A01X17IE01
    *1 Shift Solenoid Valve SR:

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve SR connector terminal - Shift solenoid valve SR body 20°C (68°F) 11 to 15 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      • Battery positive (+) → Shift solenoid valve SR connector

      • Battery negative (-) → Shift solenoid valve SR body

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  8. INSPECT SHIFT SOLENOID VALVE SLT

    A01X4SRE01
    *a Component without harness connected: (Shift Solenoid Valve SLT)

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      • Battery positive (+) with a 21 W bulb → Shift solenoid valve Terminal 2

      • Battery negative (-) → Terminal 1

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  9. INSPECT SHIFT SOLENOID VALVE SLU

    A01X4SRE02
    *a Component without harness connected: (Shift Solenoid Valve SLU)

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      • Battery positive (+) with a 21 W bulb → Shift solenoid valve Terminal 2

      • Battery negative (-) → Terminal 1

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.