PROCEDURE
INSPECT SHIFT SOLENOID VALVE SR
| *1 | Shift Solenoid Valve SR: |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| OK | ||||
|---|---|---|---|---|
|
If the result is not as specified, replace the solenoid valve.
INSPECT SHIFT SOLENOID VALVE SLU
| *a | Component without harness connected: (Shift Solenoid Valve SLU) |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| OK | ||||
|---|---|---|---|---|
|
If the result is not as specified, replace the solenoid valve.
INSPECT SHIFT SOLENOID VALVE SL2
| *a | Component without harness connected: (Shift Solenoid Valve SL2) |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| OK | ||||
|---|---|---|---|---|
|
If the result is not as specified, replace the solenoid valve.
INSPECT SHIFT SOLENOID VALVE SLT
| *a | Component without harness connected: (Shift Solenoid Valve SLT) |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| OK | ||||
|---|---|---|---|---|
|
If the result is not as specified, replace the solenoid valve.
INSPECT SHIFT SOLENOID VALVE SL1
| *a | Component without harness connected: (Shift Solenoid Valve SL1) |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| OK | ||||
|---|---|---|---|---|
|
If the result is not as specified, replace the solenoid valve.
INSPECT SHIFT SOLENOID VALVE S1
| *1 | Shift Solenoid Valve S1: |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| OK | ||||
|---|---|---|---|---|
|
If the result is not as specified, replace the solenoid valve.
INSPECT SHIFT SOLENOID VALVE S2
| *1 | Shift Solenoid Valve S2: |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| OK | ||||
|---|---|---|---|---|
|
If the result is not as specified, replace the solenoid valve.