SHIFT LEVER INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY

    A01X85TE03

    1. Install the transmission floor shift assembly with the 4 bolts. Tighten the bolts in the order shown in the illustration.

      Torque:
      14 N*m  { 143 kgf*cm, 10 ft.*lbf }
      Text in Illustration
      B001XPG Bolt
      A01X4WG Connector
    2. Connect the 3 connectors.

  2. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY

    A01X3L4E02

    1. Turn the control shaft lever RH of the park/neutral position switch counterclockwise until it stops, and then turn it clockwise 2 notches to set it to the N position.

    2. Move the shift lever to N.

    3. A01X3N1E05

      Temporarily install the floor shift gear shifting rod sub-assembly to the transmission floor shift assembly with the nut.

    4. Tighten the nut while lightly pushing the lever rearward.

      Torque:
      13 N*m  { 130 kgf*cm, 9 ft.*lbf }
      Text in Illustration
      *a Lever
      B001XPG Nut
      A01X4WG Push
  3. INSTALL FRONT CONSOLE BOX (w/o Cool Box)

    Click here

  4. INSTALL FRONT CONSOLE BOX (w/ Cool Box)

    Click here