PROCEDURE
INSTALL GENERATOR ASSEMBLY
Install the stud bolt.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
Install the generator with the 3 bolts and nut.
| 43 N*m | 438 kgf*cm | 32 ft.*lbf |
Connect the harness bracket to the generator with the bolt.
| 31 N*m | 316 kgf*cm | 23 ft.*lbf |
Connect the generator wire with the nut.
| 9.8 N*m | 100 kgf*cm | 87 in.*lbf |
Close the terminal cap.
Connect the generator connector.
CONNECT OIL COOLER PIPE ASSEMBLY
CONNECT VANE PUMP ASSEMBLY
INSTALL AIR CLEANER ASSEMBLY
INSTALL AIR CLEANER HOSE ASSEMBLY
INSTALL FRONT FENDER APRON SEAL FRONT RH
INSTALL FAN AND GENERATOR V BELT
INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
INSTALL V-BANK COVER SUB-ASSEMBLY