Click here

GENERATOR INSTALLATION

Click here
Click here Click here

PROCEDURE


  1. Click here

    INSTALL GENERATOR ASSEMBLY


    1. Install the stud bolt.

      10 N*m 102 kgf*cm 7 ft.*lbf
    2. Install the generator with the 3 bolts and nut.

      43 N*m 438 kgf*cm 32 ft.*lbf
    3. Connect the harness bracket to the generator with the bolt.

      31 N*m 316 kgf*cm 23 ft.*lbf
    4. Connect the generator wire with the nut.

      9.8 N*m 100 kgf*cm 87 in.*lbf
    5. Close the terminal cap.

    6. Connect the generator connector.

  2. Click here

    CONNECT OIL COOLER PIPE ASSEMBLY

    Click here

  3. Click here

    CONNECT VANE PUMP ASSEMBLY

    Click here

  4. Click here

    INSTALL AIR CLEANER ASSEMBLY

    Click here

  5. Click here

    INSTALL AIR CLEANER HOSE ASSEMBLY

    Click here

  6. Click here

    INSTALL FRONT FENDER APRON SEAL FRONT RH

    Click here

  7. Click here

    INSTALL FAN AND GENERATOR V BELT

    Click here

  8. Click here

    INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

    Click here

  9. Click here

    INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

    Click here

  10. Click here

    INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

    Click here

  11. Click here

    CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

  12. Click here

    INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here