GENERATOR(for 130 A, 150 A Type) INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the stud bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Install the generator with the 3 bolts and nut.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
    3. Connect the harness bracket to the generator with the bolt.

      Torque:
      31 N*m  { 316 kgf*cm, 23 ft.*lbf }
    4. Connect the generator wire with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    5. Close the terminal cap.

    6. Connect the generator connector.

  2. CONNECT OIL COOLER TUBE

    Click here

  3. CONNECT VANE PUMP ASSEMBLY

    Click here

  4. INSTALL AIR CLEANER CAP AND HOSE

    Click here

  5. INSTALL FRONT FENDER APRON TRIM PACKING A

    Click here

  6. INSTALL FAN AND GENERATOR V BELT

    Click here

  7. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

    Click here

  8. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

    Click here

  9. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

    Click here

  10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  11. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here