GENERATOR(for 130 A Type) INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the generator bracket to the generator with the bolt.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    2. Install the generator with the 2 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
    3. Connect the generator bracket with the bolt.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    4. Connect the wire harness clamp bracket with the bolt.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    5. Connect the generator wire to terminal B with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    6. Close the terminal cap.

    7. Connect the generator connector.

  2. INSTALL FRONT FENDER APRON TRIM PACKING B

    Click here

  3. INSTALL FAN AND GENERATOR V BELT

    Click here

  4. INSPECT FAN AND GENERATOR V BELT

    Click here

  5. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

    Click here

  6. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

    Click here

  7. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

    Click here

  8. INSTALL V-BANK COVER

    Click here

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.