PROCEDURE
INSTALL NOISE FILTER
for Bank 2:
Install the noise filter to the cylinder head cover with the bolt.
for Bank 1:
Install the noise filter to the cylinder head cover with the bolt.
INSTALL IGNITION COIL ASSEMBLY
Install the 8 ignition coils with the 8 bolts.
INSTALL NO. 11 WATER BY-PASS HOSE
| *1 | Paint Mark |
| *a | Rear |
| *b | Front |
Install the No. 11 water by-pass hose.
Tech Tips
When connecting the hose, make sure the paint marks and clips are as shown in the illustration.
The direction of the hose clamp is indicated in the illustration.
INSTALL ENGINE WIRE
Attach the 3 wire harness clamps to install the engine wire.
Connect the 4 knock sensor connectors.
Install the bolt.
INSTALL NO. 1 ENGINE COVER
INSTALL NO. 2 ENGINE COVER
INSTALL SEPARATOR CASE
INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY
INSTALL WATER PUMP PULLEY
INSTALL NO. 1 WATER BY-PASS HOSE
INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY
INSTALL NO. 3 ENGINE COVER
INSTALL NO. 4 ENGINE COVER
INSTALL NO. 2 FUEL DELIVERY PIPE SUB-ASSEMBLY
INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH
Install the front No. 1 engine mounting bracket LH with the 4 bolts.
INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH
Install the front No. 1 engine mounting bracket RH with the 4 bolts.
INSTALL NO. 1 EGR PIPE BRACKET
Install the No. 1 EGR pipe bracket with the 3 bolts.
INSTALL NO. 1 WATER OUTLET PIPE
Install the No. 1 water outlet pipe with the 2 bolts.
CONNECT NO. 11 WATER BY-PASS HOSE
| *1 | Paint Mark |
| *a | Upper Side |
Connect the No. 11 water by-pass hose.
Tech Tips
The direction of the hose clamp is indicated in the illustration.
INSTALL NO. 8 WATER BY-PASS HOSE
| *1 | Paint Mark |
| *a | Upper Side |
| *b | Front |
Install the No. 8 water by-pass hose.
Tech Tips
When connecting the hose, make sure the paint marks and clips are as shown in the illustration.
The direction of each hose clamp is indicated in the illustration.
INSTALL NO. 2 WATER BY-PASS PIPE
| *1 | Paint Mark |
| *a | Upper Side |
Install the No. 2 water by-pass pipe with the 2 bolts and connect the hose.
Tech Tips
When connecting the hose, make sure the paint marks and clips are as shown in the illustration.
The direction of each hose clamp is indicated in the illustration.
INSTALL NO. 3 AIR TUBE (w/ Secondary Air Injection System)
Install the No. 3 air tube with the bolt.
INSTALL NO. 4 AIR TUBE (w/ Secondary Air Injection System)
Install the No. 4 air tube with the bolt.
INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 2)
for Bank 1 Click here
for Bank 2 Click here
INSTALL FUEL TUBE SUB-ASSEMBLY
INSTALL FUEL HOSE
INSTALL ENGINE WIRE