VACUUM SWITCHING VALVE(for Engine Mounting) INSTALLATION

PROCEDURE


  1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY


    1. A01WZYH

      Install the VSV with the bolt.

      Torque:
      6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
    2. Connect the 2 vacuum hoses and connector.