PROCEDURE
REMOVE V-BANK COVER SUB-ASSEMBLY
REMOVE AIR CLEANER AND HOSE
Disconnect the No. 2 PCV hose and No. 1 air hose.
Disconnect the mass air flow meter connector and detach the clamp.
Remove the 3 bolts and loosen the hose clamp, and then remove the air cleaner and hose.
REMOVE IGNITION COIL ASSEMBLY
for Bank 1:
Detach the 4 clamps and disconnect the engine wire.
Disconnect the 4 ignition coil connectors.
Remove the 4 bolts and 4 ignition coils.
for Bank 2:
Remove the 2 bolts and disconnect the water by-pass pipe.
Detach the 3 clamps and disconnect the engine wire.
Disconnect the 4 ignition coil connectors.
Remove the 4 bolts and 4 ignition coils.
REMOVE SPARK PLUG
Using a 16 mm plug wrench, remove the 8 spark plugs.