PROCEDURE
INSPECT AIR PUMP HEATER RELAY (AI-PMP HTR)
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the relay.
INSPECT AIR INJECTION VSV RELAY (AI-VSV)
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the relay.
INSPECT NO. 1 INTEGRATION RELAY (IG2)
Measure the resistance of the IG2 MAIN fuse.
Remove the IG2 MAIN fuse from the No. 1 integration relay.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the IG2 MAIN fuse.
Install the IG2 MAIN fuse to the No. 1 integration relay.
| *a | Component without harness connected (No. 1 Integration Relay) |
Measure the resistance of the ignition relay No. 2 (IG2) circuit.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the No. 1 integration relay.
INSPECT NO. 1 INTEGRATION RELAY (EFI)
Measure the resistance of the EFI MAIN fuse.
Remove the EFI MAIN fuse from the No. 1 integration relay.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the EFI MAIN fuse.
Install the EFI MAIN fuse to the No. 1 integration relay.
| *a | Component without harness connected (No. 1 Integration Relay) |
Measure the resistance of the EFI relay circuit.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the No. 1 integration relay.
INSPECT EFI NO. 2 RELAY
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the relay.
INSPECT NO. 1 INTEGRATION RELAY (A/F)
Measure the resistance of the A/F fuse.
Remove the A/F fuse from the No. 1 integration relay.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the A/F fuse.
Install the A/F fuse to the No. 1 integration relay.
| *a | Component without harness connected (No. 1 Integration Relay) |
Measure the resistance of the air fuel ratio sensor heater relay circuit.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the No. 1 integration relay.
INSPECT MAIN BODY ECU (IG1 NO. 1)
Measure the resistance according to the value(s) in the table below.
| *a | Component without harness connected (Main Body ECU) |
- | - |
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the main body ECU.
INSPECT STARTER RELAY (ST)
INSPECT STARTER CUT RELAY (ST CUT)
INSPECT MAIN BODY ECU (ACC RELAY)