CAMSHAFT OIL CONTROL VALVE INSTALLATION

PROCEDURE


  1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)


    1. Apply a light coat of engine oil to a new O-ring.

    2. Install the O-ring to the camshaft timing oil control valve.

    3. Install the camshaft timing oil control valve with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    4. Connect the camshaft timing oil control valve connector.

  2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)


    1. Apply a light coat of engine oil to a new O-ring.

    2. Install the O-ring to the camshaft timing oil control valve.

    3. Install the camshaft timing oil control valve with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    4. Connect the camshaft timing oil control valve connector.

    5. w/ Secondary Air Injection System:


      1. Connect the air pipe with the bolt.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      2. Attach the clamp and connect the throttle body connector.

  3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)


    1. Apply a light coat of engine oil to a new O-ring.

    2. Install the O-ring to the camshaft timing oil control valve.

    3. Install the camshaft timing oil control valve with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    4. Connect the camshaft timing oil control valve connector.

  4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)


    1. Apply a light coat of engine oil to a new O-ring.

    2. Install the O-ring to the camshaft timing oil control valve.

    3. Install the camshaft timing oil control valve with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    4. Connect the camshaft timing oil control valve connector.

  5. INSTALL AIR CLEANER CAP AND HOSE

    Click here

  6. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here