PROCEDURE
INSTALL SPARK PLUG
Install the 6 spark plugs.
INSTALL IGNITION COIL ASSEMBLY
Install the 6 ignition coils with the 6 bolts.
Connect the 6 ignition coil connectors.
INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
INSTALL NO. 2 AIR TUBE (w/ Secondary Air Injection System)
INSTALL NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
INSTALL AIR TUBE (w/ Secondary Air Injection System)
INSTALL AIR CLEANER CASE SUB-ASSEMBLY
INSTALL AIR CLEANER CAP AND HOSE
| *a | Top |
| *b | Front |
| *c | Protrusion (Hose) |
| *d | Protrusion (Throttle body) |
Install the air cleaner cap and hose.
Install the air cleaner cap and hose with the bolt and fasten the 4 hook clamps.
Tighten the clamp.
Attach the 4 clamps and connect the No. 2 PCV hose, vacuum hose and mass air flow meter connector.
Tech Tips
The direction of the hose clamp is indicated in the illustration.
INSTALL V-BANK COVER