PROCEDURE
DISCHARGE FUEL SYSTEM PRESSURE
PRECAUTION
Note
After turning the engine switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work Click here.
DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
REMOVE V-BANK COVER SUB-ASSEMBLY
REMOVE AIR CLEANER CAP AND HOSE
REMOVE FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
REMOVE FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH
REMOVE NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
DRAIN ENGINE COOLANT
REMOVE NO. 5 WATER BY-PASS PIPE
Disconnect the 2 water by-pass hoses and remove the 2 bolts and No. 5 water by-pass pipe.
REMOVE EGR VALVE BRACKET
Detach the 2 wire harness clamps and PCV hose clamp.
Remove the 3 bolts and EGR valve bracket.
REMOVE PCV HOSE ASSEMBLY
Disconnect the PCV hose from the PCV pipe of the cylinder head cover LH and RH.
Remove the bolt and PCV hose.
REMOVE AIR TUBE SUB-ASSEMBLY (w/ Secondary Air Injection System)
Disconnect the No. 2 air injection system hose from the air switching valve.
Disconnect the manifold absolute pressure sensor connector and detach the clamp.
Remove the 2 bolts and bracket.
Remove the bolt and air tube.
REMOVE INTAKE MANIFOLD
w/o Secondary Air Injection System:
Disconnect the manifold absolute pressure sensor connector and detach the clamp.
Remove the 2 bolts and bracket.
Disconnect the No. 4 water by-pass hose.
Disconnect the throttle position sensor and throttle control motor connector.
Disconnect the PCV valve hose.
Disconnect the purge VSV connector.
Disconnect the purge line hose from the purge VSV.
Disconnect the vacuum switching valve connector (for ACIS).
Remove the bolt.
Detach the 3 wire harness clamps from the 3 wire harness brackets.
Disconnect the fuel tube from the fuel delivery pipe Click here.
Disconnect the fuel tube from the No. 2 fuel delivery pipe Click here.
Remove the 2 nuts, 8 bolts, intake manifold and 2 gaskets.
|
Bolt |
|
Nut |
REMOVE FUEL TUBE SUB-ASSEMBLY
Remove the bolt and fuel tube from the intake manifold.
REMOVE BRACKET
Remove the 2 bolts and 2 brackets.
REMOVE V-BANK COVER BRACKET
Remove the 2 bolts and V-bank cover bracket.
REMOVE V-BANK COVER PIN
Remove the V-bank cover pin from the intake manifold.
REMOVE INTAKE FLANGE
Remove the 2 nuts and intake flange.
REMOVE STUD BOLT
Note
If a stud bolt is deformed or its threads are damaged, replace it.
Using an E5 "TORX" socket wrench, remove the 2 stud bolts.
REMOVE VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
Disconnect the 2 vacuum hoses and detach the 3 clamps.
Remove the bolt and vacuum switching valve.
REMOVE PURGE VSV
Disconnect the purge line hose from the intake manifold.
Remove the bolt and purge VSV.
REMOVE MANIFOLD ABSOLUTE PRESSURE SENSOR
REMOVE THROTTLE BODY WITH MOTOR ASSEMBLY
Remove the 4 bolts, throttle body with motor assembly and gasket.