AIR SWITCHING VALVE(for Bank 2) INSTALLATION

PROCEDURE


  1. INSTALL AIR SWITCHING VALVE ASSEMBLY


    1. A01X1IRE02
      Text in Illustration
      *1 Air Switching Valve
      *2 Claw
      *3 No. 3 Air Tube

      Install a new gasket and the air switching valve with the 3 bolts.

      Torque:
      24 N*m  { 245 kgf*cm, 18 ft.*lbf }

      Note

      Make sure the claws of the gasket are not caught between the air switching valve and No. 3 air tube.

    2. Install the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Attach the wire harness clamp and connect the air switching valve connector.

  2. CONNECT NO. 1 AIR INJECTION SYSTEM HOSE


    1. A01X5BQE02
      Text in Illustration
      *1 Protrusion
      *2 Paint Mark

      Align the paint mark with the projection and connect the No. 1 air injection system hose.

      Tech Tips

      Make sure the direction of the hose clamp is as shown in the illustration.

  3. CONNECT NO. 3 PCV HOSE


    1. Connect the No. 3 PCV hose.

  4. INSTALL AIR CLEANER CAP AND HOSE

    Click here

  5. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here