AIR SWITCHING VALVE(for Bank 2) REMOVAL

PROCEDURE


  1. REMOVE V-BANK COVER SUB-ASSEMBLY

    Click here

  2. REMOVE AIR CLEANER CAP AND HOSE

    Click here

  3. DISCONNECT NO. 3 PCV HOSE


    1. A01X7PC

      Disconnect the No. 3 PCV hose.

  4. DISCONNECT NO. 1 AIR INJECTION SYSTEM HOSE


    1. A01X948

      Disconnect the No. 1 air injection system hose.

  5. REMOVE AIR SWITCHING VALVE ASSEMBLY


    1. A01X5PL

      Detach the wire harness clamp and disconnect the air switching valve connector.

    2. A01X9W5

      Remove the 2 bolts.

    3. A01X9I0

      Remove the 3 bolts, air switching valve and gasket.

      Note

      Be careful not to damage the surfaces that contact the gasket.