PROCEDURE
REMOVE V-BANK COVER SUB-ASSEMBLY
REMOVE AIR CLEANER CAP AND HOSE
DISCONNECT NO. 3 PCV HOSE
Disconnect the No. 3 PCV hose.
DISCONNECT NO. 1 AIR INJECTION SYSTEM HOSE
Disconnect the No. 1 air injection system hose.
REMOVE AIR SWITCHING VALVE ASSEMBLY
Detach the wire harness clamp and disconnect the air switching valve connector.
Remove the 2 bolts.
Remove the 3 bolts, air switching valve and gasket.
Note
Be careful not to damage the surfaces that contact the gasket.