AIR SWITCHING VALVE(for Bank 1) INSTALLATION

PROCEDURE


  1. INSTALL AIR SWITCHING VALVE ASSEMBLY


    1. A01WZ2EE02
      Text in Illustration
      *1 No. 4 Air Tube
      *2 Claw
      *3 Air Switching Valve

      Install a new gasket and the air switching valve with the 3 bolts.

      Torque:
      24 N*m  { 245 kgf*cm, 18 ft.*lbf }

      Note

      Make sure the gasket's claws are not caught between the air switching valve and No. 4 air tube.

    2. Install the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Connect the wire harness clamp bracket with the bolt.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  2. CONNECT NO. 2 AIR INJECTION SYSTEM HOSE


    1. A01X8ZZE02
      Text in Illustration
      *1 Protrusion
      *2 Paint Mark

      Connect the No. 2 air injection system hose.

      Tech Tips

      Make sure the direction of the hose clamp is as shown in the illustration.

    2. Connect the connector.