AIR SWITCHING VALVE(for Bank 2) INSTALLATION

PROCEDURE


  1. INSTALL NO. 2 EMISSION CONTROL VALVE SET


    1. Install the No. 2 emission control valve set with the 3 nuts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. A01X5K1E01
      Text in Illustration
      *1 Paint Mark
      *2 Rib
      *a Top
      *b LH Side

      Align the paint mark with the rib and connect the No. 1 air hose.

      Tech Tips

      Make sure the direction of the hose clamp is as shown in the illustration.

    3. Connect the No. 2 emission control valve set connector.

  2. INSTALL NO. 2 AIR TUBE


    1. A01X7SIE02
      Text in Illustration
      *1 Claw
      *2 No. 2 Air Tube

      Install 2 new gaskets.

      Note

      Make sure the gasket's claws are not caught between the No. 2 emission control valve set and No. 2 air tube.

    2. Install the No. 2 air tube with the 2 bolts and 2 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  3. INSTALL PURGE VSV


    1. Install the purge VSV Click here.